Domestic Joint Exploration

Onshore Fields

TP - NVT

Evaluation studies continued under NVT Perenco operatorship. Reprocess studies of Koban 3D, Kastel-Karaali 3D data and Kuzey Hazro 2B lines. Geophysical and geophysical interpretation studies in Eylül-Çıralı field near Kuzey Hazro continued. Güldere-1 well drilling was completed. Koban 3D and Kastel 3D seismic data interpretation continued, production temporarily halted in Kedil-1 well, Kedil-2 well drilling was realized. Well completion activities were completed in Girdara-2 well, whose drilling was realized in 2013, it is temporarily relinquished. Softek 2D seismic data acquisition activities, which was planned to be 209,16 km, was completed as 168,6 due to security reasons and data process studies initiated. Application for new licenses and adaptation activities went on. Technical and Work Council meetings were held regularly. Operation and investment programme were compared in year-end meetings. In order to overcome logistic and security based issues in the fields under Perenco's operatorship, partners came to an agreement to assign operatorship to TP for 2 years, necessary studies and arrangements initiated.

TP- TIWAY OIL

Examining the current lines and well data continued.

TP – AMITY OIL

In the context of Joint Operation Aggreement between TP and Amity oil for Thrace Basin; condensate and naturalgas production from D.Yenibağ-1, Göçerler, Adatepe, D. Adatepe, Reisdere, Eskitaşlı, Dikilitaş, Paşaköy, Kumdere, Yenibağ and Pelit fields have continued and exploration studies in exploration licenses.

TP – SHELL

Technical surveillance of 2 wells, drilled for Shell Dadaş Project, have continued. In order to determine the potential cooperation fields of unconventional projects, MOU was signed with Halliburton.

Offshore Fields

TP - TIWAY - FOINAVON

Gas production from Ayazlı, D. Ayazlı, Akkaya and Akçakoca fields in joint licenses have continued throughout the years. In production wells of Akçakoca platform, additional perforation was made. By revision of the compressor, the production has continued even in low pressure. Geological and geophysical evaluation continued for new exploration targets that are economical.

TP - SHELL (BLACK SEA)

Partnership meetings with Shell for a part of No: AR/TPO/3920 license (Black Sea) initiated in 2012 and it has been reached an agreement. It was inured with Cabinet Decree. As required in the agreement, 1.540 km2 3D and 190 km 2D seismic acquired with Barbaros Hayreddin Paşa seismic ship. Process of a variety of data, produced through process activities of CGG Oslo office, was completed in 2014. Likewise reprocess activities of Limanköy and Boğaziçi 3D seismic data and 13 territorial seismic lines which is 1.500 km in length, initiated in ION-GXT London office. It is also completed in 2014. Following these territorial and areal interpretation, one exploration well was decided to be drilled in deep down of the license. Noble Globetrotter II drill ship entered in Beşiktaş Harbour in Yalova and the well in the ship is being demounted.

TP - SHELL (MEDITERRANEAN SEA)

In Mediterranean Sea, offshore fields of Antalya Bay, in No: AR/TPO/4154, AR/TPO/4319 ve AR/TPO/4320 licenses, the activities in the context of the farm-in and Joint Operationg Agreement signed between TP and Shell, were terminated on 7 November 2014.

TP - SHELL (LEBANON)

In the context of Lebanon Offshore Fields, technical studies of the hydrocarbon potential of Lebanon offshore fields completed. The tender was postponed to an unknown date and it is planned to continue the activities considering these facts.